AUTOMATION TESTING:
Definition: Automated testing is running test cases where manual intervention is not required to run each one.
Benefits of Automated Testing:
Reliable: Tests perform precisely the same operations each time they are run, thereby eliminating human error
Repeatable: You can test how the software reacts under repeated execution of the same operations.
Programmable: You can program sophisticated tests that bring out hidden information from the application.
Reusable: You can reuse tests on different versions of an application, even if the user interface changes.
Better Quality Software: Because you can run more tests in less time with fewer resources
Fast: Automated Tools run tests significantly faster than human users.
Cost Reduction: As the number of resources for regression test are reduced.
SILK TEST AUTOMATION TOOL
Introduction:
Silk Test is a tool specifically designed for doing REGRESSION AND FUNCTIONALITY testing. It is developed by Segue Software Inc. Silk Test is the industry’s leading functional testing product for e-business applications, whether Window based, Web, Java, or traditional client/server-based. Silk Test also offers test planning, management, direct database access and validation, the flexible and robust 4Test scripting language, a built in recovery system for unattended testing, and the ability to test across multiple platforms, browsers and technologies.
You have two ways to create automated tests using silk-test:
1) Use the Record test case command to record actions
The record test case command helps us to record various actions which we perform on AUT(Application under test) actions are captured in the 4TEST language (which is the inbuilt language in SILK test tool).
These recorded actions are then saved as *.t file.
The *.t file saved in the SILK test environment, can be played back by clicking on the RUN command or by pressing F9 functional key.
In this way we can record actions on AUT and then play them back for verifying the results of the actions recorded.
2) Write the testcase manually using the 4Test scripting language.
One can write testcases manually by using scripting language i.e. 4test language by using various methods and functions available.
How SilkTest works?
Applications are composed of graphical user interface (GUI) objects such as
windows, menus and buttons that a user manipulates using a keyboard and a
mouse to initiate application operations. SilkTest interprets these objects and recognizes them based on the class, properties and methods that uniquely identify them. During testing, SilkTest interacts with the objects to submit operations to the application automatically, simulating the actions of a user, and then verifies the results of each operation. The simulated user, SilkTest, is said to be driving the application.
SilkTest consists of two distinct components that execute in separate
processes:
1)The SilkTest Host software
2)The SilkTest Agent software
The SilkTest Host
The host software is the SilkTest component you use to develop, edit,
compile, run and debug your test scripts and testplans. The machine that runs this component is often referred to as the host machine.
The SilkTest Agent
The SilkTest Agent is the component of SilkTest that interacts with the GUI
of your application. The Agent translates the commands in your 4Test scripts
into GUI specific commands, driving and monitoring the application you are
testing. The Agent can run locally on the same machine on which the Host is
running or, in a networked environment, any number of Agents can run on
remote machines. In a networked environment, the machine that runs the
Agent is often referred to as the remote machine.
Monday, May 2, 2011
Tuesday, April 5, 2011
Unit Testing
Unit Testing: Unit is testable piece of s/w that can be build and executed under the control a test driver or Testing individual s/w component.
Unit Testing focuses on the smallest unit of software design or module.
# Unit Test Environment:-
1. Driver: It is just like main program that accepts case, data and prints the relevant results
A test driver simulates a calling component or external environment.
2. Stubs: - It is just like a dummy subprogram that returns control to the module undergoing testing.
A test stub simulates a called component.
The unit test heavily uses white box testing and the testing can be conducted in parallel for multiple components.
3. It is usually done by the developer.
# Activities in Unit Testing:-
1. Develop unit test plan
2. Design unit test case
3. Develop unit test case
4. Execute unit test case
# Unit test conditions:
-Interface
-Local data structure
-Boundary conditions
-Basis path
-Error handling paths.
# Unit Test Techniques: -
# White box Testing:-
-Basis path testing
-Loop Testing
-Condition Testing
-Data definition and use testing
-Internal boundary value testing
# Black box Testing:-
-Specification derived tests
-Equivalence portioning
-State transition testing
# Common errors uncovered during unit testing.
-Incorrect arithmetic precedence
-Incorrect precision
-Incorrect symbolic representation etc.
# Major benefits of unit testing:
-Be able to detect and remove defects at a much less cost compared to other later stages of testing.
-Simplifies debugging.
-Able to achieve a high level of structural coverage of code.
# Why unit Test:-
-Nobody is perfect.
-Bug in development tools.
-Certain bugs easier to find in unit testing.
-To localize defects
What is a unit?
In conventional structured programming language like C, Pascal
Unit:- Function, Procedure or subroutine.
In Object oriented language like JAVA and C++
Unit: Class
In ADA Unit could be Package or Procedures.
In 4GLS, Unit could be a display window, menu etc.
# Misconceptions of Unit Testing:-
-It is waste of time.
-Only proves that code does what the code does
-I am too good a programmer to need unit tests.
-Integration tests will catch all bugs any way.
-It is not cost effective.
# Develop unit Test Plan:-
-Entry criteria:-
An approved detailed design (Program specs) is available
-Validation:-
Unit test Plan (UTP) is reviewed
-Exit Criteria:-
UTP is reviewed and approved.
# Design Unit Test Cases:-
-Entry Criteria: -
-UTP is available
-An approved detailed design is available
Validation:-
-Design of unit test cases is reviewed.
Exit Criteria
-Unit Test cases design is reviewed and approved.
# Develop unit test cases
-Entry Criteria: Design of unit test cases is available
-Validation: - unit test cases are reviewed
-Exit Criteria:- Unit test cases are reviewed and approved.
# Execute unit test cases:-
Entry criteria :- Approved unit test cases are available and Inspected code is available
Validation: Defect report reviewed.
Exit Criteria: - Test items passed the unit testing as per pass/fail criteria in the UTP
Unit testing summary details are available in the defect report
# Test Design
-Test strategy
-Test Planning
-Test Specification
-Test Procedure
# Test Specification:
-Test objective
-Initial stage of the unit
-Input
-Expected output
# UNIT Test Steps:-
-Make it run
-Positive Testing
-Negative Testing
-Special consideration
-Coverage Tests.
Unit Test Plan Template
Unit id: Prepared by
Unit Name Prepared on
Testing By Testing on
Unit Testing focuses on the smallest unit of software design or module.
# Unit Test Environment:-
1. Driver: It is just like main program that accepts case, data and prints the relevant results
A test driver simulates a calling component or external environment.
2. Stubs: - It is just like a dummy subprogram that returns control to the module undergoing testing.
A test stub simulates a called component.
The unit test heavily uses white box testing and the testing can be conducted in parallel for multiple components.
3. It is usually done by the developer.
# Activities in Unit Testing:-
1. Develop unit test plan
2. Design unit test case
3. Develop unit test case
4. Execute unit test case
# Unit test conditions:
-Interface
-Local data structure
-Boundary conditions
-Basis path
-Error handling paths.
# Unit Test Techniques: -
# White box Testing:-
-Basis path testing
-Loop Testing
-Condition Testing
-Data definition and use testing
-Internal boundary value testing
# Black box Testing:-
-Specification derived tests
-Equivalence portioning
-State transition testing
# Common errors uncovered during unit testing.
-Incorrect arithmetic precedence
-Incorrect precision
-Incorrect symbolic representation etc.
# Major benefits of unit testing:
-Be able to detect and remove defects at a much less cost compared to other later stages of testing.
-Simplifies debugging.
-Able to achieve a high level of structural coverage of code.
# Why unit Test:-
-Nobody is perfect.
-Bug in development tools.
-Certain bugs easier to find in unit testing.
-To localize defects
What is a unit?
In conventional structured programming language like C, Pascal
Unit:- Function, Procedure or subroutine.
In Object oriented language like JAVA and C++
Unit: Class
In ADA Unit could be Package or Procedures.
In 4GLS, Unit could be a display window, menu etc.
# Misconceptions of Unit Testing:-
-It is waste of time.
-Only proves that code does what the code does
-I am too good a programmer to need unit tests.
-Integration tests will catch all bugs any way.
-It is not cost effective.
# Develop unit Test Plan:-
-Entry criteria:-
An approved detailed design (Program specs) is available
-Validation:-
Unit test Plan (UTP) is reviewed
-Exit Criteria:-
UTP is reviewed and approved.
# Design Unit Test Cases:-
-Entry Criteria: -
-UTP is available
-An approved detailed design is available
Validation:-
-Design of unit test cases is reviewed.
Exit Criteria
-Unit Test cases design is reviewed and approved.
# Develop unit test cases
-Entry Criteria: Design of unit test cases is available
-Validation: - unit test cases are reviewed
-Exit Criteria:- Unit test cases are reviewed and approved.
# Execute unit test cases:-
Entry criteria :- Approved unit test cases are available and Inspected code is available
Validation: Defect report reviewed.
Exit Criteria: - Test items passed the unit testing as per pass/fail criteria in the UTP
Unit testing summary details are available in the defect report
# Test Design
-Test strategy
-Test Planning
-Test Specification
-Test Procedure
# Test Specification:
-Test objective
-Initial stage of the unit
-Input
-Expected output
# UNIT Test Steps:-
-Make it run
-Positive Testing
-Negative Testing
-Special consideration
-Coverage Tests.
Unit Test Plan Template
Unit id: Prepared by
Unit Name Prepared on
Testing By Testing on
SOFTWARE TESTING
INTRUDUCTION:
Software Testing is a critical element of software quality assurance and represents the ultimate process to ensure the correctness of the product.
Software Testing: Testing is the process of executing a program with intent of finding errors.
# What is the purpose of testing:-
-To show the software works: - it is known as demonstrated oriented.
-To show the software doesn’t work: - it is known as destruction oriented.
- To minimize the risk of not working up to acceptable level. It is known as evaluation oriented.
-To show the product is free from defect.
Why do we need test:-
Defect can exist in the software, as it is developed by human who can make mistakes during the development of software. It is the primary duty of a software vendor to ensure that software doesn’t have defect, error free application or product.
# The most common origin of software bug is due to
-Poor understanding and incomplete requirement
-Unrealistic schedule
-Fast changes in requirement
-Too many assumptions and compliancy
# Approaches to testing:
1. Debug oriented.
2. Demonstration oriented.
3. Evaluation oriented.
4. Prevention oriented.
# Purpose of debugging: Find the error/misconception that led to failure and implement progress changes that correct the error.
# Test Case: - Test case is an identify associated with program behavior it has set of input and list of expected output.
# What is bug: - Software did not operate as intended.
# Importance of Testing:-
-Testing is a critical element of s/w QA.
-Post release removal of defects in the s/w most expensive.
-Significant portion of life cycle effort expanded on testing.
# Mainly Testing Involves:
-Plan for Testing
-Design test conditions, cases.
-Develop test data.
-Create required test environment
-Execute tests
-Analyze actual result with expected results.
-Results: Test Passed or Failed.
# Level of Testing:
1. Unit Testing
2. Integration Testing
3. System Testing
4. User Acceptance Testing.
Software Testing is a critical element of software quality assurance and represents the ultimate process to ensure the correctness of the product.
Software Testing: Testing is the process of executing a program with intent of finding errors.
# What is the purpose of testing:-
-To show the software works: - it is known as demonstrated oriented.
-To show the software doesn’t work: - it is known as destruction oriented.
- To minimize the risk of not working up to acceptable level. It is known as evaluation oriented.
-To show the product is free from defect.
Why do we need test:-
Defect can exist in the software, as it is developed by human who can make mistakes during the development of software. It is the primary duty of a software vendor to ensure that software doesn’t have defect, error free application or product.
# The most common origin of software bug is due to
-Poor understanding and incomplete requirement
-Unrealistic schedule
-Fast changes in requirement
-Too many assumptions and compliancy
# Approaches to testing:
1. Debug oriented.
2. Demonstration oriented.
3. Evaluation oriented.
4. Prevention oriented.
# Purpose of debugging: Find the error/misconception that led to failure and implement progress changes that correct the error.
# Test Case: - Test case is an identify associated with program behavior it has set of input and list of expected output.
# What is bug: - Software did not operate as intended.
# Importance of Testing:-
-Testing is a critical element of s/w QA.
-Post release removal of defects in the s/w most expensive.
-Significant portion of life cycle effort expanded on testing.
# Mainly Testing Involves:
-Plan for Testing
-Design test conditions, cases.
-Develop test data.
-Create required test environment
-Execute tests
-Analyze actual result with expected results.
-Results: Test Passed or Failed.
# Level of Testing:
1. Unit Testing
2. Integration Testing
3. System Testing
4. User Acceptance Testing.
India Glorious win on the World Cup 2011 !!!!!
India won the world cup in 1983.It was indeed the most prestigious and memorable day for the entire country.

We achieved this under the the captaincy of Mr. Kapil Dev.

The wait is finally over. After 28 long years, India finally laid their hand on the ICC Cricket World Cup. During the miracle run in 1983 it was Kapil Dev who led the troops to glory and this time it was Mahendra Singh Dhoni who led from the front and helped India achieve their dream. The Indian team had a billion hopes resting on their shoulders, and they made each and every Indian proud on Saturday night as they became the first lost nation to lift the world cup.



The best part of this victory was that it was not just cricket fans that were ecstatic, but it was every Indian who basked in the moment of glory.


We achieved this under the the captaincy of Mr. Kapil Dev.

The wait is finally over. After 28 long years, India finally laid their hand on the ICC Cricket World Cup. During the miracle run in 1983 it was Kapil Dev who led the troops to glory and this time it was Mahendra Singh Dhoni who led from the front and helped India achieve their dream. The Indian team had a billion hopes resting on their shoulders, and they made each and every Indian proud on Saturday night as they became the first lost nation to lift the world cup.



The best part of this victory was that it was not just cricket fans that were ecstatic, but it was every Indian who basked in the moment of glory.

Thursday, March 3, 2011
Info On BUDGET 2011
IT & ITeS:
• Minimum Alternative Tax (MAT) to be levied on units operating in Special Economic Zones (SEZ).
• MAT rates to be hiked from 18% to 18.50% while surcharge is reduced from 7.50% to 5%.
• Excise duty on parts of ink jet and laser jet printers reduced from 10% to 5%.
• Excise duty of 5% has been imposed on specified IT products such as microprocessor other than motherboards, floppy disc drives, CD-Rom drive.
• Full exemption is provided for components of computer connectivity cable imported for its manufacture.
• Full exemption on payment of additional duty of customs on packaged/canned software.
Education:
• An allocation of Rs 520.57 bn in FY12 for education, which is an increase of 24% over FY11.
• The proposal to increase the plan allocation for school education to Rs 389.57 bn in FY12 from Rs 310.36 bn in FY11.
• An allocation of Rs 210 bn for Sarva Shiksha Abhiyan which is 40% higher than Rs 150 bn allocated in FY11. A revised Centrally Sponsored Scheme “Vocationalisation of Secondary Education”
will be implemented from FY12 to improve the employability of the youth.
• An allocation of Rs 103.80 bn for National Programme of Mid Day Meals in schools.
• An allocation of Rs 52.54 bn for University Grants Commission; Rs 56.60 bn for technical education and Rs 9.43 bn for National Mission in Education through information & communication technology.
• Connectivity to all 1,500 institutions of Higher Learning and Research through optical fiber backbone to be provided by March, 2012.
• Additional Rs 5 bn proposed to be provided for National Skill Development Fund during FY12.
• Introduce a scholarship scheme in FY12 for needy students belonging to the Scheduled Castes and Scheduled Tribes studying in classes ninth and tenth which would benefit about 40 lakh Scheduled Caste and Scheduled Tribe students.
• Rs 500 mn each to upcoming centres of Aligarh Muslim University at Murshidabad in West Bengal and Malappuram in Kerala.
• Rs 1 bn as one-time grant to the Kerala Veterinary and Animal Sciences University at Pookode, Kerala.
• Rs 100 mn each for setting up Kolkata and Allahabad Centres of Mahatma Gandhi Antarrashtriya Hindi Vishwavidyalaya, Wardha.
• Rs 2 bn as one time grant to IIT, Kharagpur.
• Rs 200 mn for Rajiv Gandhi National Institute of Youth Development, Sriperumbudur, Tamil Nadu.
• Rs 200 mn for IIM, Kolkata, to set up its Financial Research and Trading Laboratory.
• Rs 2 bn for Maulana Azad Education Foundation.
• Rs 100 mn for Centre for Development Economics and Ratan Tata Library, Delhi School of Economics, Delhi and Rs 100 mn for Madras School of Economics.
Agriculture:
• The total plan outlay for agriculture & allied sector is to be increased by 19.79% to Rs 147.44 bn.
• The target agricultural credit is proposed to be raised to Rs 4,750 bn in FY12 from Rs 3,750 bn in FY11.
• The Government raised the corpus of RIDF (Rural Infrastructure Development Fund) XVII to Rs 180 bn in FY12 from Rs 160 bn in FY11 wherein the additional allocation would be dedicated to creation of warehousing facilities.
• Interest subvention proposed to be enhanced from 2% to 3% for providing short-term crop loans to farmers who repay their crop loan on time.
• In view of enhanced target for flow of agriculture credit, capital base of NABARD to be strengthened by Rs 30 bn in a phased manner.
• Rs 100 bn to be contributed to NABARD’s Short-term Rural Credit fund for FY12.
• An allocation under Rashtriya Krishi Vikas Yojana (RKVY) increased to Rs 78.60 bn in FY12 from Rs 67.55 bn in FY11.
• An allocation of Rs 17 bn for National Horticulture Mission including Rs 5 bn for north east and Himalayan states.
• An allocation of Rs 13.50 bn for National Food Security Mission.
• An allocation of Rs 7.80 bn for Macro Management in Agriculture.
• An allocation of Rs 11.50 bn for National Mission on Micro Irrigation.
• An allocation of Rs 7 bn for National Agricultural Insurance Scheme including Rs 1.50 bn for Modified national Agriculture insurance scheme.
• An allocation of Rs 5.50 bn for integrated oilseeds, oil palms, pulses and maize development.
• Removal of production and distribution bottlenecks for items like fruits and vegetables, milk, meat, poultry and fish to be the focus of attention this year.
• To improve rice based cropping system in the eastern region, an allocation of Rs 4 bn has been made.
• An allocation of Rs 3 bn made to promote 60,000 pulses villages in rainfed areas.
• An allocation of Rs 3 bn to bring 60,000 hectares under oil palm plantations - an initiative to yield about 3 lakh metric tonnes of palm oil annually in five years.
• As an initiative on vegetable clusters, an allocation of Rs 3 bn made for implementation of vegetable initiative to provide quality vegetable at competitive prices.
• An allocation of Rs 3 bn provided to promote higher production of Bajra, Jowar, Ragi and other millets, which are highly nutritious and have several medicinal properties.
• An allocation of Rs 3 bn provided for Accelerated Fodder Development Programme to benefit farmers in 25,000 villages.
• The Government to promote organic farming methods, combining modern technology with traditional farming practices.
• An approval being given to set up 15 more Mega Food Parks during FY12.
• Augmentation of storage capacity through private entrepreneurs and warehousing corporations has been fast tracked.
• Capital investment in creation of modern storage capacity will be eligible for viability gap funding of the Finance Ministry. It is also proposed to recognize cold chains and post-harvest storage as an
infrastructure sub-sector.
• In view of recent episode of inflation, need for State Governments to review and enforce a reformed Agriculture Produce Marketing Act been recognised.
• National Food Security Bill (NFSB) which will be introduced in the Parliament during the course of the current year.
• Extended full exemption from excise duty to air-conditioning equipment and refrigeration panels for cold chain infrastructure.
• Include conveyor belts in the full exemption from excise duty to equipments used in cold storages, mandis and warehouses.
• Basic customs duty reduced for specified agricultural machinery to 2.50% from 5% and the concession is also being extended to parts of such machinery to encourage their domestic production.
• Basic customs duty reduced on micro-irrigation equipment to 5% from 7.50%.
• De-oiled rice bran cake fully exempted from basic customs duty. Simultaneously, an export duty of 10% to be levied on its export.
• Minimum Alternative Tax (MAT) to be levied on units operating in Special Economic Zones (SEZ).
• MAT rates to be hiked from 18% to 18.50% while surcharge is reduced from 7.50% to 5%.
• Excise duty on parts of ink jet and laser jet printers reduced from 10% to 5%.
• Excise duty of 5% has been imposed on specified IT products such as microprocessor other than motherboards, floppy disc drives, CD-Rom drive.
• Full exemption is provided for components of computer connectivity cable imported for its manufacture.
• Full exemption on payment of additional duty of customs on packaged/canned software.
Education:
• An allocation of Rs 520.57 bn in FY12 for education, which is an increase of 24% over FY11.
• The proposal to increase the plan allocation for school education to Rs 389.57 bn in FY12 from Rs 310.36 bn in FY11.
• An allocation of Rs 210 bn for Sarva Shiksha Abhiyan which is 40% higher than Rs 150 bn allocated in FY11. A revised Centrally Sponsored Scheme “Vocationalisation of Secondary Education”
will be implemented from FY12 to improve the employability of the youth.
• An allocation of Rs 103.80 bn for National Programme of Mid Day Meals in schools.
• An allocation of Rs 52.54 bn for University Grants Commission; Rs 56.60 bn for technical education and Rs 9.43 bn for National Mission in Education through information & communication technology.
• Connectivity to all 1,500 institutions of Higher Learning and Research through optical fiber backbone to be provided by March, 2012.
• Additional Rs 5 bn proposed to be provided for National Skill Development Fund during FY12.
• Introduce a scholarship scheme in FY12 for needy students belonging to the Scheduled Castes and Scheduled Tribes studying in classes ninth and tenth which would benefit about 40 lakh Scheduled Caste and Scheduled Tribe students.
• Rs 500 mn each to upcoming centres of Aligarh Muslim University at Murshidabad in West Bengal and Malappuram in Kerala.
• Rs 1 bn as one-time grant to the Kerala Veterinary and Animal Sciences University at Pookode, Kerala.
• Rs 100 mn each for setting up Kolkata and Allahabad Centres of Mahatma Gandhi Antarrashtriya Hindi Vishwavidyalaya, Wardha.
• Rs 2 bn as one time grant to IIT, Kharagpur.
• Rs 200 mn for Rajiv Gandhi National Institute of Youth Development, Sriperumbudur, Tamil Nadu.
• Rs 200 mn for IIM, Kolkata, to set up its Financial Research and Trading Laboratory.
• Rs 2 bn for Maulana Azad Education Foundation.
• Rs 100 mn for Centre for Development Economics and Ratan Tata Library, Delhi School of Economics, Delhi and Rs 100 mn for Madras School of Economics.
Agriculture:
• The total plan outlay for agriculture & allied sector is to be increased by 19.79% to Rs 147.44 bn.
• The target agricultural credit is proposed to be raised to Rs 4,750 bn in FY12 from Rs 3,750 bn in FY11.
• The Government raised the corpus of RIDF (Rural Infrastructure Development Fund) XVII to Rs 180 bn in FY12 from Rs 160 bn in FY11 wherein the additional allocation would be dedicated to creation of warehousing facilities.
• Interest subvention proposed to be enhanced from 2% to 3% for providing short-term crop loans to farmers who repay their crop loan on time.
• In view of enhanced target for flow of agriculture credit, capital base of NABARD to be strengthened by Rs 30 bn in a phased manner.
• Rs 100 bn to be contributed to NABARD’s Short-term Rural Credit fund for FY12.
• An allocation under Rashtriya Krishi Vikas Yojana (RKVY) increased to Rs 78.60 bn in FY12 from Rs 67.55 bn in FY11.
• An allocation of Rs 17 bn for National Horticulture Mission including Rs 5 bn for north east and Himalayan states.
• An allocation of Rs 13.50 bn for National Food Security Mission.
• An allocation of Rs 7.80 bn for Macro Management in Agriculture.
• An allocation of Rs 11.50 bn for National Mission on Micro Irrigation.
• An allocation of Rs 7 bn for National Agricultural Insurance Scheme including Rs 1.50 bn for Modified national Agriculture insurance scheme.
• An allocation of Rs 5.50 bn for integrated oilseeds, oil palms, pulses and maize development.
• Removal of production and distribution bottlenecks for items like fruits and vegetables, milk, meat, poultry and fish to be the focus of attention this year.
• To improve rice based cropping system in the eastern region, an allocation of Rs 4 bn has been made.
• An allocation of Rs 3 bn made to promote 60,000 pulses villages in rainfed areas.
• An allocation of Rs 3 bn to bring 60,000 hectares under oil palm plantations - an initiative to yield about 3 lakh metric tonnes of palm oil annually in five years.
• As an initiative on vegetable clusters, an allocation of Rs 3 bn made for implementation of vegetable initiative to provide quality vegetable at competitive prices.
• An allocation of Rs 3 bn provided to promote higher production of Bajra, Jowar, Ragi and other millets, which are highly nutritious and have several medicinal properties.
• An allocation of Rs 3 bn provided for Accelerated Fodder Development Programme to benefit farmers in 25,000 villages.
• The Government to promote organic farming methods, combining modern technology with traditional farming practices.
• An approval being given to set up 15 more Mega Food Parks during FY12.
• Augmentation of storage capacity through private entrepreneurs and warehousing corporations has been fast tracked.
• Capital investment in creation of modern storage capacity will be eligible for viability gap funding of the Finance Ministry. It is also proposed to recognize cold chains and post-harvest storage as an
infrastructure sub-sector.
• In view of recent episode of inflation, need for State Governments to review and enforce a reformed Agriculture Produce Marketing Act been recognised.
• National Food Security Bill (NFSB) which will be introduced in the Parliament during the course of the current year.
• Extended full exemption from excise duty to air-conditioning equipment and refrigeration panels for cold chain infrastructure.
• Include conveyor belts in the full exemption from excise duty to equipments used in cold storages, mandis and warehouses.
• Basic customs duty reduced for specified agricultural machinery to 2.50% from 5% and the concession is also being extended to parts of such machinery to encourage their domestic production.
• Basic customs duty reduced on micro-irrigation equipment to 5% from 7.50%.
• De-oiled rice bran cake fully exempted from basic customs duty. Simultaneously, an export duty of 10% to be levied on its export.
Wednesday, March 2, 2011
Top 20 Software Testing tips.
1) Learn to analyze your test results thoroughly
2) Learn to maximize the test coverage
3) To ensure maximum test coverage break your application under test (AUT) into smaller functional modules.
4) While writing test cases, write test cases for intended functionality first i.e. for valid conditions according to requirements.
5) Think positive. Start testing the application by intend of finding bugs/errors. Don’t think beforehand that there will not be any bugs in the application.
6) Write your test cases in requirement analysis and design phase itself. This way you can ensure all the requirements are testable.
7) Make your test cases available to developers prior to coding. Don’t keep your test cases with you waiting to get final application release for testing, thinking that you can log more bugs.
8 ) If possible identify and group your test cases for regression testing.
9) Applications requiring critical response time should be thoroughly tested for performance. Performance testing is the critical part of many applications.
10) Programmers should not test their own code. As discussed in our previous post, basic unit testing of developed application should be enough for developers to release the application for testers.
11) Go beyond requirement testing. Test application for what it is not supposed to do.
12) While doing regression testing use previous bug graph (Bug graph – number of bugs found against time for different modules). This module-wise bug graph can be useful to predict the most probable bug part of the application.
13) Note down the new terms, concepts you learn while testing.
14) Many times testers or developers make changes in code base for application under test.
15) Keep developers away from test environment. This is required step to detect any configuration changes missing in release or deployment document.
16) It’s a good practice to involve testers right from software requirement and design phase.
17) Testing teams should share best testing practices, experience with other teams in their organization.
18) Increase your conversation with developers to know more about the product. Whenever possible make face-to-face communication for resolving disputes quickly and to avoid any misunderstandings.
19) Don’t run out of time to do high priority testing tasks. Prioritize your testing work from high to low priority and plan your work accordingly.
20) Write clear, descriptive, unambiguous bug report. Do not only provide the bug symptoms but also provide the effect of the bug and all possible solutions.
2) Learn to maximize the test coverage
3) To ensure maximum test coverage break your application under test (AUT) into smaller functional modules.
4) While writing test cases, write test cases for intended functionality first i.e. for valid conditions according to requirements.
5) Think positive. Start testing the application by intend of finding bugs/errors. Don’t think beforehand that there will not be any bugs in the application.
6) Write your test cases in requirement analysis and design phase itself. This way you can ensure all the requirements are testable.
7) Make your test cases available to developers prior to coding. Don’t keep your test cases with you waiting to get final application release for testing, thinking that you can log more bugs.
8 ) If possible identify and group your test cases for regression testing.
9) Applications requiring critical response time should be thoroughly tested for performance. Performance testing is the critical part of many applications.
10) Programmers should not test their own code. As discussed in our previous post, basic unit testing of developed application should be enough for developers to release the application for testers.
11) Go beyond requirement testing. Test application for what it is not supposed to do.
12) While doing regression testing use previous bug graph (Bug graph – number of bugs found against time for different modules). This module-wise bug graph can be useful to predict the most probable bug part of the application.
13) Note down the new terms, concepts you learn while testing.
14) Many times testers or developers make changes in code base for application under test.
15) Keep developers away from test environment. This is required step to detect any configuration changes missing in release or deployment document.
16) It’s a good practice to involve testers right from software requirement and design phase.
17) Testing teams should share best testing practices, experience with other teams in their organization.
18) Increase your conversation with developers to know more about the product. Whenever possible make face-to-face communication for resolving disputes quickly and to avoid any misunderstandings.
19) Don’t run out of time to do high priority testing tasks. Prioritize your testing work from high to low priority and plan your work accordingly.
20) Write clear, descriptive, unambiguous bug report. Do not only provide the bug symptoms but also provide the effect of the bug and all possible solutions.
Thursday, February 3, 2011
Health tips by Awadesh

Health and Fitness has now become one of the major concerns. Earlier humans used to hunt for their living, due to which their body had to undergo a lot of physical exercise. This made life active and alert. Now, life has become more simple and easy. Everything we need is just a phone call away. This easy life has restricted humans to do that bit of physical exercise which is required to keep the body fit and healthy. We get instant, spicy and variety of food which lose their nutrition during the process.
How do we ensure that we have all that we need to have a healthy living? This is a big question among everyone. We need proper nutrition and a fit and healthy body. Good Health is all that one craves for. Becoming healthier and fitter though not very difficult needs dedicated efforts.
Nutrition and Health Diet
The basic foundation for a healthy individual starts from his foetal stage with proper and healthy nutrition derived from his or her mother. Hence, a pregnant woman's diet stands atop all diets.
Your food shall be your medicine. Ayurveda has postulated the role of food and especially nutritive foods for maintaining health as well as cure of diseases. Nutrients are necessary for the proper functioning of mental, physical, metabolic, chemical and hormonal activities. The body is like a machine that will repair and rebuild itself if proper nutrition is provided by way of food.
Sumptous nutrition is available in fruits and vegetables. Fruits have the capacity to give all that a body needs. How to consume? What to consume? Which fruit helps in which way? The answers to these questions can be found in our Nutrition and Healthy Diet
Exercise and Fitness
Simple fitness exercises can help to have a fitter and healthy life. Stretching exercises can help in many ways in mainting a fitter body. Weight loss can be achieved by following simple effortless regular exercises. Medical breakthroughs can happen by regular meditation and exercising. Yoga and other workouts which can be performed easily are available in this website to keep you fit and healthy.
Health and Fitness can make all that difference in one's life. Healthy living is all that one needs, and to achieve that we picked up the best of the articles from reliable sources and have presented here in an organized manner. You might not be able to spend your valuable time on complicated medications and diet controls, but, you can find articles to help you have a better living using simple and easy technics.
Ayurveda, a science in vogue practiced since centuries, uses a wide variety of plants, animal origin substances, mineral and metallic substances to rebalance the diseased condition in the sick. A few tips on simple treatment of life style diseases have been carefully picked for the visitors of this website. These tips can help reduce or control diseases like diabetes, cholesterol, blood pressure, etc.
Yoga for good health
This section provides you with various articles related Yoga and other technics to manage your daily life.
This section provides you with informative articles on Yoga. Simple technics and tips to maintain good health. Before starting to work on Yoga, one has to understand yoga better. For attaining a healthy life, physical excercises, yoga technics need to be practiced with utmost care. These should however be practiced under the supervision of a trained person.
You can find Helpful articles on Yoga, easy to follow yoga Tips and Technics. Introduction to Yoga and its benefits to attain healthy life. Simple and easy to follow physical exercises help you in your daily routine.
Articles for stress relief and eye strain below gives you easy to follow tips and technics to overcome stress and also treat your eyes. These technics result in stress relief and treatment to your eyes.
General Health Care
Tummy troubles and treatment: Is that terrible tummy ache taking the wind out of your sails? Making you sleepless, stressed, and irritable? Well, it’s not just your mind that is irritated but something deep down in your belly your bowel! Get up and get cracking
Weaning the child from breast feeding: Weaning should be a very slow activity. It is a very difficult phase in the baby's growing stage.
A complex breakfast can keep kids mentally healthy: The child's breakfast should be nutrious so that they do not get into depression.
Keep a watch on your wasteline for a healthy living: Expanding wastelines could become hazardous.
Keep a watch on your cholesterol levels: High cholesterol levels can be controlled but exercise and diet.
Software testing life cycle
Software testing life cycle identifies what test activities to carry out and when (what is the best time) to accomplish those test activities. Even though testing differs between organizations, there is a testing life cycle.
The software testing life cycle (STLC) identifies all testing activities and their relationship with other activities in the software development life cycle (SDLC).
What Does Testing Involve?
• Testing = Verification + Validation
• Verification: building the product right
• Validation: building the right product
• A broad and continuous activity throughout the software life cycle
• An information gathering activity to enable the evaluation of our work
e.g.:
-Does it meet the user’s requirements?
-What are the limitations?
-What are the risks of releasing it?
Software Testing Life Cycle consists of six (generic) phases:
• Test Planning
• Test Analysis
• Test Design
• Construction and verification
• Testing Cycles
• Final Testing and Implementation
• Post Implementation
Software testing has its own life cycle that intersects with every stage of the SDLC. The basic requirements in software testing life cycle is to control/deal with software testing – Manual, Automated and Performance.
Test Planning
This is the phase where Project Manager has to decide what things need to be tested, do I have the appropriate budget etc.
Naturally proper planning at this stage would greatly reduce the risk of low quality software. This planning will be an ongoing process with no end point. Activities at this stage would include preparation of high level test plan-(according to IEEE test plan template The Software Test Plan (STP) is designed to prescribe the scope, approach, resources, and schedule of all testing activities. The plan must identify the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan.). Almost all of the activities done during this stage are included in this software test plan and revolve around a test plan.
In Test Planning following are the major tasks:
1. Defining scope of testing
2. Identification of approaches
3. Defining risk
4. Identifying resources
5. Defining Time Schedule
Test Analysis
Once test plan is made and decided upon, next step is to deal a little more into the project and decide what types of testing should be carried out at different stages of SDLC, do we need or plan to automate, if yes then when the appropriate time to automate is, what type of specific documentation I need for testing.
Proper and regular meetings should be held between testing teams, project managers, and development teams, Business Analysts to check the progress of things which will give a fair idea of the movement of the project and ensure the completeness of the test plan created in the planning phase, which will further help in enhancing the right testing strategy created earlier. We will start creating test case formats and test cases itself. In this stage we need to develop Functional validation matrix based on Business Requirements to ensure that all system requirements are covered by one or more test cases, identify which test cases to automate, begin review of documentation, i.e. Functional Design, Business Requirements, Product Specifications, Product Externals etc. We also have to define areas for Stress and Performance Testing.
Test Design
Test plans and cases which were developed in the analysis phase are revised. Functional validation matrix is also revised and finalized. In this stage risk assessment criteria is developed. If you have thought of automation then you have to select which test cases to automate and begin writing scripts for them. Test data is prepared. Standards for unit testing and pass / fail criteria are defined here. Schedule for testing is revised (if necessary) & finalized and test environment is prepared.
Construction and verification
In this phase we have to complete all the test plans, test cases, complete the scripting of the automated test cases, Stress and Performance testing plans needs to be completed. We have to support the development team in their unit testing phase. And obviously bug reporting would be done as when the bugs are found. Integration tests are performed and errors (if any) are reported.
Testing Cycles
In this phase we have to complete testing cycles until test cases are executed without errors or a predefined condition is reached. Run test cases --> Report Bugs --> revise test cases (if needed) --> add new test cases (if needed) --> bug fixing --> retesting (test cycle 2, test cycle 3….).
Final Testing and Implementation
In this we have to execute remaining stress and performance test cases, documentation for testing is completed / updated, provide and complete different matrices for testing. Acceptance, load and recovery testing will also be conducted and the application needs to be verified under production conditions.
Post Implementation
In this phase, the testing process is evaluated and lessons learnt from that testing process are documented. Line of attack to prevent similar problems in future projects is identified. Create plans to improve the processes. The recording of new errors and enhancements is an ongoing process. Cleaning up of test environment is done and test machines are restored to base lines in this stage.
Software Testing Life Cycle Models
http://testingsolution.blogspot.com/2006/12/software-testing-life-cycle-models.html
http://www.extremesoftwaretesting.com/Directory/SoftwareTestingLifeCycle.html
Important software testing links:
http://www.softwaretestinghelp.com/
The software testing life cycle (STLC) identifies all testing activities and their relationship with other activities in the software development life cycle (SDLC).
What Does Testing Involve?
• Testing = Verification + Validation
• Verification: building the product right
• Validation: building the right product
• A broad and continuous activity throughout the software life cycle
• An information gathering activity to enable the evaluation of our work
e.g.:
-Does it meet the user’s requirements?
-What are the limitations?
-What are the risks of releasing it?
Software Testing Life Cycle consists of six (generic) phases:
• Test Planning
• Test Analysis
• Test Design
• Construction and verification
• Testing Cycles
• Final Testing and Implementation
• Post Implementation
Software testing has its own life cycle that intersects with every stage of the SDLC. The basic requirements in software testing life cycle is to control/deal with software testing – Manual, Automated and Performance.
Test Planning
This is the phase where Project Manager has to decide what things need to be tested, do I have the appropriate budget etc.
Naturally proper planning at this stage would greatly reduce the risk of low quality software. This planning will be an ongoing process with no end point. Activities at this stage would include preparation of high level test plan-(according to IEEE test plan template The Software Test Plan (STP) is designed to prescribe the scope, approach, resources, and schedule of all testing activities. The plan must identify the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan.). Almost all of the activities done during this stage are included in this software test plan and revolve around a test plan.
In Test Planning following are the major tasks:
1. Defining scope of testing
2. Identification of approaches
3. Defining risk
4. Identifying resources
5. Defining Time Schedule
Test Analysis
Once test plan is made and decided upon, next step is to deal a little more into the project and decide what types of testing should be carried out at different stages of SDLC, do we need or plan to automate, if yes then when the appropriate time to automate is, what type of specific documentation I need for testing.
Proper and regular meetings should be held between testing teams, project managers, and development teams, Business Analysts to check the progress of things which will give a fair idea of the movement of the project and ensure the completeness of the test plan created in the planning phase, which will further help in enhancing the right testing strategy created earlier. We will start creating test case formats and test cases itself. In this stage we need to develop Functional validation matrix based on Business Requirements to ensure that all system requirements are covered by one or more test cases, identify which test cases to automate, begin review of documentation, i.e. Functional Design, Business Requirements, Product Specifications, Product Externals etc. We also have to define areas for Stress and Performance Testing.
Test Design
Test plans and cases which were developed in the analysis phase are revised. Functional validation matrix is also revised and finalized. In this stage risk assessment criteria is developed. If you have thought of automation then you have to select which test cases to automate and begin writing scripts for them. Test data is prepared. Standards for unit testing and pass / fail criteria are defined here. Schedule for testing is revised (if necessary) & finalized and test environment is prepared.
Construction and verification
In this phase we have to complete all the test plans, test cases, complete the scripting of the automated test cases, Stress and Performance testing plans needs to be completed. We have to support the development team in their unit testing phase. And obviously bug reporting would be done as when the bugs are found. Integration tests are performed and errors (if any) are reported.
Testing Cycles
In this phase we have to complete testing cycles until test cases are executed without errors or a predefined condition is reached. Run test cases --> Report Bugs --> revise test cases (if needed) --> add new test cases (if needed) --> bug fixing --> retesting (test cycle 2, test cycle 3….).
Final Testing and Implementation
In this we have to execute remaining stress and performance test cases, documentation for testing is completed / updated, provide and complete different matrices for testing. Acceptance, load and recovery testing will also be conducted and the application needs to be verified under production conditions.
Post Implementation
In this phase, the testing process is evaluated and lessons learnt from that testing process are documented. Line of attack to prevent similar problems in future projects is identified. Create plans to improve the processes. The recording of new errors and enhancements is an ongoing process. Cleaning up of test environment is done and test machines are restored to base lines in this stage.
Software Testing Life Cycle Models
http://testingsolution.blogspot.com/2006/12/software-testing-life-cycle-models.html
http://www.extremesoftwaretesting.com/Directory/SoftwareTestingLifeCycle.html
Important software testing links:
http://www.softwaretestinghelp.com/
Kannada Sahitya Sammelana
Kannada Sahitya Sammelana
Kannada Sahitya Sammelana (Kannada Literature Conference) is the premier gathering of writers, poets and kannadigas. It is held with the aim of preserving and developing Kannada language, its literature, arts, culture and music. It was started in 1915 and held at Bangalore for the first time. It used to be inaugurated by prominent writers and poets from 1915 to 1948. Since then it has been inaugurated by the Chief Minister of Karnataka. The Kannada Sahitya Parishat is responsible for holding the gathering.
Bangalore to host 77th Kannada Sahitya Sammelan:
Kannada Sahitya Sammelana 2011 will be hold upon 4th February. It will be organized by Kannada Sahitya Parishat. It is a Kannada Literature Conference. This is a 77th Akila Bharatha Kannada Sahitya Sammelana at the National College (Basavanagudi) grounds in Bangalore on December 24, 25 and 26 after a gap of 40 years. It is an entertainment of writers, poets as well as Kannadigas.
The Main Aim:
The main aim of Kannada Sahitya Sammelana is of preserving and developing Kannada language, its literature, arts, culture and music. Kannada Sahitya Sammelanna was started in 1915 and held at Bangalore for the first time. Upto 1948 by prominent writers and poets it has been inaugurated. Since then it has been inaugurated by the Chief Minister of Karnataka.
Kannada Saahithya Parishath is an Indian non-profit organization that promotes the Kannada language. Its headquarters are in the city of Bangalore, in the state of Karnataka, India. Kannada Saahithya Parishath strives to promote Kannada through publishing books, organizing literary seminars and promoting research projects. Kannada Saahithya Parishath also organizes an annual conference on Kannada literature called, Kannada Sahithya Sammelana.
Venue Detail:
National College ground (Basavanagudi) Bangalore.
For more details (List of Kannada Sahitya Sammelana) click on the below link:
http://en.wikipedia.org/wiki/Kannada_Sahitya_Sammelana
Kannada Sahitya Sammelana (Kannada Literature Conference) is the premier gathering of writers, poets and kannadigas. It is held with the aim of preserving and developing Kannada language, its literature, arts, culture and music. It was started in 1915 and held at Bangalore for the first time. It used to be inaugurated by prominent writers and poets from 1915 to 1948. Since then it has been inaugurated by the Chief Minister of Karnataka. The Kannada Sahitya Parishat is responsible for holding the gathering.
Bangalore to host 77th Kannada Sahitya Sammelan:
Kannada Sahitya Sammelana 2011 will be hold upon 4th February. It will be organized by Kannada Sahitya Parishat. It is a Kannada Literature Conference. This is a 77th Akila Bharatha Kannada Sahitya Sammelana at the National College (Basavanagudi) grounds in Bangalore on December 24, 25 and 26 after a gap of 40 years. It is an entertainment of writers, poets as well as Kannadigas.
The Main Aim:
The main aim of Kannada Sahitya Sammelana is of preserving and developing Kannada language, its literature, arts, culture and music. Kannada Sahitya Sammelanna was started in 1915 and held at Bangalore for the first time. Upto 1948 by prominent writers and poets it has been inaugurated. Since then it has been inaugurated by the Chief Minister of Karnataka.
Kannada Saahithya Parishath is an Indian non-profit organization that promotes the Kannada language. Its headquarters are in the city of Bangalore, in the state of Karnataka, India. Kannada Saahithya Parishath strives to promote Kannada through publishing books, organizing literary seminars and promoting research projects. Kannada Saahithya Parishath also organizes an annual conference on Kannada literature called, Kannada Sahithya Sammelana.
Venue Detail:
National College ground (Basavanagudi) Bangalore.
For more details (List of Kannada Sahitya Sammelana) click on the below link:
http://en.wikipedia.org/wiki/Kannada_Sahitya_Sammelana
Thursday, January 6, 2011
Team Outing
The Team Outing done in the year 2010
We had 2 team outings this year which was a half yearly team outing and an Annual team outing
Firstly the half yearly outing was in the month of --------------- and we all had been to Asia’s largest mall which is very close by to ur office i.e. Mantri Square and had a great time watching the movie RAAJNEETHI. We all enjoyed the movie and stayed back for a good evening snacks and headed back home. Inspite of having very less time to spend with each other in a group we did enjoy every aspect of our outing to the maximum extent.
Secondly the annual team outing was in the month of December and we had been to The GOLDEN TEMPLE in Vellore and on the way back we had been to YELAGIRI HILLS also called as Poor Man’s Ooty .
Our entire outing was filled with lots of fun and the main person to keep us lively throughout was our Automation Senior Vijay Murugan
The most beautiful experience which could be recollected by everyone would be the hill top trekking which we did for almost 2 hours where we came across beautiful farm which was filled with delightful yellow flowers which reminded us of DDLJ movie and all of us enjoyed the scenic beauty of the hills.
Our trip ended by our visit to a Murugan temple on the hill top and headed back to Bangalore
We enjoyed a lot and had a great time with each other which is truly memorable by everyone in the team.
Annual team outing:


We had 2 team outings this year which was a half yearly team outing and an Annual team outing
Firstly the half yearly outing was in the month of --------------- and we all had been to Asia’s largest mall which is very close by to ur office i.e. Mantri Square and had a great time watching the movie RAAJNEETHI. We all enjoyed the movie and stayed back for a good evening snacks and headed back home. Inspite of having very less time to spend with each other in a group we did enjoy every aspect of our outing to the maximum extent.
Secondly the annual team outing was in the month of December and we had been to The GOLDEN TEMPLE in Vellore and on the way back we had been to YELAGIRI HILLS also called as Poor Man’s Ooty .
Our entire outing was filled with lots of fun and the main person to keep us lively throughout was our Automation Senior Vijay Murugan
The most beautiful experience which could be recollected by everyone would be the hill top trekking which we did for almost 2 hours where we came across beautiful farm which was filled with delightful yellow flowers which reminded us of DDLJ movie and all of us enjoyed the scenic beauty of the hills.
Our trip ended by our visit to a Murugan temple on the hill top and headed back to Bangalore
We enjoyed a lot and had a great time with each other which is truly memorable by everyone in the team.
Annual team outing:
Software testing best practices -- By Ram Chillarge
http://www.xtremeedge.in/pdf/testing/Software%20Testing%20Best%20Practice.pdf
Test Management tools evaluated
Team has done the analysis on the folowing test management tools.
1. TestRun
2. Testuff
3. Vienna (nmaqa)
4. Chrysilla
5. Testlink
6. Testlog
7. Automature
8. Aptest Test
9. Rth Test
10. QA-Complete
11. Spira
Will update the blog once we come to the conclusion on which one use
1. TestRun
2. Testuff
3. Vienna (nmaqa)
4. Chrysilla
5. Testlink
6. Testlog
7. Automature
8. Aptest Test
9. Rth Test
10. QA-Complete
11. Spira
Will update the blog once we come to the conclusion on which one use
Monday, December 6, 2010
General Info on Test Management Tool
Definition:
A tool that provides support to the test management and controls the part of a test process. It often has several capabilities, such as test ware management, scheduling of tests, and the logging of results, progress tracking, incident management and test reporting.
Some benefits of using test management tool:
1. Creates an unlimited amount of test cases.
2. Links test cases to products and components being tested.
3. Links requirements to tests and issues.
4. Test cases tree (hierarchical folders) provides a familiar method for organizing requirements and test cases.
5. Group any number of test cases into test sets according to the testing procedure design.
6. Assign test cases to specific resources and track progress and current status of local and off shore work force.
7. Easily maintain regression and sanity sets as product testing moves forward.
8. Dashboard customization per user enables a quick review on testing progress, product quality etc.
9. Export test cases to Excel, Word or email.
10. Define when an alert should be sent and to whom using the email notification system.
A tool that provides support to the test management and controls the part of a test process. It often has several capabilities, such as test ware management, scheduling of tests, and the logging of results, progress tracking, incident management and test reporting.
Some benefits of using test management tool:
1. Creates an unlimited amount of test cases.
2. Links test cases to products and components being tested.
3. Links requirements to tests and issues.
4. Test cases tree (hierarchical folders) provides a familiar method for organizing requirements and test cases.
5. Group any number of test cases into test sets according to the testing procedure design.
6. Assign test cases to specific resources and track progress and current status of local and off shore work force.
7. Easily maintain regression and sanity sets as product testing moves forward.
8. Dashboard customization per user enables a quick review on testing progress, product quality etc.
9. Export test cases to Excel, Word or email.
10. Define when an alert should be sent and to whom using the email notification system.
About Test Automature (Test Management Tool)
Brief explanation:
Automature has three products right now namely Zermatt, Zug and Zuoz. There are two more products named Nyon and Davos which are in the development stage.
Zermatt is a dashboard at the core of the Automature products and includes the user interface for complete planning and reporting and the data warehouse.
Zug provides an execution environment for tests specified using CHUR. ZUG is platform independent and can be used on any environment that supports the Java Runtime Environment.
Zuoz is a collection of atom and molecule libraries, organized by application domain and functionality, intended to be used in test case design using the CHUR syntax.
(Chur: Chur is Automature's test specification language that allows users to describe test case logic in a manner that is intuitive to the test design process, as well as it is efficient and powerful enough to describe very complex scenarios in a simple manner.)
Features supported:
• Specifying Requirements
• Planning Tests
• Specifying Releases and Cycles
• Specifying Test cases
• Requirement & Test case Tagging
• Version control
• Test case prioritization
• Running Tests
• Capturing test results
• Test history
• Multiple user access for each project
• Different user Roles and Permissions
• Multiple project handling
• Data to/from external source (Word, Excel)
• Build wise test results
• Alerting on Changes
• Document Generation
• Test Auditing
For detailed information regarding each of these products, kindly visit the Products page of this website www.automature.com
Automature has three products right now namely Zermatt, Zug and Zuoz. There are two more products named Nyon and Davos which are in the development stage.
Zermatt is a dashboard at the core of the Automature products and includes the user interface for complete planning and reporting and the data warehouse.
Zug provides an execution environment for tests specified using CHUR. ZUG is platform independent and can be used on any environment that supports the Java Runtime Environment.
Zuoz is a collection of atom and molecule libraries, organized by application domain and functionality, intended to be used in test case design using the CHUR syntax.
(Chur: Chur is Automature's test specification language that allows users to describe test case logic in a manner that is intuitive to the test design process, as well as it is efficient and powerful enough to describe very complex scenarios in a simple manner.)
Features supported:
• Specifying Requirements
• Planning Tests
• Specifying Releases and Cycles
• Specifying Test cases
• Requirement & Test case Tagging
• Version control
• Test case prioritization
• Running Tests
• Capturing test results
• Test history
• Multiple user access for each project
• Different user Roles and Permissions
• Multiple project handling
• Data to/from external source (Word, Excel)
• Build wise test results
• Alerting on Changes
• Document Generation
• Test Auditing
For detailed information regarding each of these products, kindly visit the Products page of this website www.automature.com
Trip Updates
The team's planning to go to ONE of the below places
1) Pondicherry
2) Shivanasamudra
3) Hogenikle
Suggestions are welcome by others if there are any other Interesting places in and around Bangalore.
1) Pondicherry
2) Shivanasamudra
3) Hogenikle
Suggestions are welcome by others if there are any other Interesting places in and around Bangalore.
Sunday, December 5, 2010
Funny Memorable moments in the last month
1) Vijay Murugan’s Anaconda Dance
2) Amar’s tumkas on the song “Apne to Aise Jaise"
3) Prakash's Sadhu avatar on one of the most famous songs "Dhum Aur Dhum"
4) Awadesh as a Ghost
2) Amar’s tumkas on the song “Apne to Aise Jaise"
3) Prakash's Sadhu avatar on one of the most famous songs "Dhum Aur Dhum"
4) Awadesh as a Ghost
Wednesday, November 10, 2010
2 new members of Systest
System Testing Team in Cymfony has become the biggest team in CNPL. We welcome 2 new members into System Testing team.
1. Mr. Prakash N Dangi:
Mr. Prakash has 2+ years experience in testing field. He has passed out MCA from K L E College of Engineering and Technology, Belgaum in 2007.
His favorite hobbies are reading books, listing to music, watching movies and playing cricket.
2. Avadesh Jha
Avadesh called "Abhi" in the team is the youngest team member who has just passed out from Babu Banarasi National Institute of Technology and Management Lucknow (U.P)
His favourite hobbies are listening to songs, playing cricket. Sourav Ganguly is his favourite cricketer.
1. Mr. Prakash N Dangi:
Mr. Prakash has 2+ years experience in testing field. He has passed out MCA from K L E College of Engineering and Technology, Belgaum in 2007.
His favorite hobbies are reading books, listing to music, watching movies and playing cricket.
2. Avadesh Jha
Avadesh called "Abhi" in the team is the youngest team member who has just passed out from Babu Banarasi National Institute of Technology and Management Lucknow (U.P)
His favourite hobbies are listening to songs, playing cricket. Sourav Ganguly is his favourite cricketer.
Tricks on testing
1. Testers should have a great presence of mind
2. Testers should learn from others mistakes, bugs.
3. Pay attention to every small, in-significant change that happen around them while testing. In other words, they work with one extra eye that keeps track of surroundings.
4. Tend to take “un-treaded“paths. Do something that is special in given circumstances
5. Think out of the box always.
6. High perseverance. Never give up!!
2. Testers should learn from others mistakes, bugs.
3. Pay attention to every small, in-significant change that happen around them while testing. In other words, they work with one extra eye that keeps track of surroundings.
4. Tend to take “un-treaded“paths. Do something that is special in given circumstances
5. Think out of the box always.
6. High perseverance. Never give up!!
Tips on finding bugs
1)Understand the whole application or module in depth before starting the testing.
2)Prepare good test cases before starting off with testing, as in give stress on the functional test cases which includes major risk of the application.
3)Create a sufficient test data before tests, this data set includes the test case conditions and also the database records if you are going to test DB related application.
4)Perform repeated tests with different test environment.
5)Try to find out the result pattern and then compare your results with those patterns.
6)When you think that you have completed most of the test conditions and when you think you are tired somewhat then do some monkey testing.
7)Use your previous test data pattern to analyze the current set of tests.
8)Try some standard test cases for which you found the bugs in some different application. Like if you are testing input text box try inserting some html tags as the inputs and see the output on display page.
9)Last and the best trick is try very hard to find the bug As if you are testing only to break the application!
2)Prepare good test cases before starting off with testing, as in give stress on the functional test cases which includes major risk of the application.
3)Create a sufficient test data before tests, this data set includes the test case conditions and also the database records if you are going to test DB related application.
4)Perform repeated tests with different test environment.
5)Try to find out the result pattern and then compare your results with those patterns.
6)When you think that you have completed most of the test conditions and when you think you are tired somewhat then do some monkey testing.
7)Use your previous test data pattern to analyze the current set of tests.
8)Try some standard test cases for which you found the bugs in some different application. Like if you are testing input text box try inserting some html tags as the inputs and see the output on display page.
9)Last and the best trick is try very hard to find the bug As if you are testing only to break the application!
Musings on Testers
Testers Mantras
1. We don't make software, but we make software better.
2. Software Testing is the only place where failure is always an option.
3. We break software so you don't have to.
4. Software Testing: The Bug Stops Here
5. We don't find bugs by chance , we create them by choice
Newton’s law on Testers
Bugs can neither be created nor be removed from software by a developer. It can only be converted from one form to another. The total number of bugs in the software always remains constant
Testing Definition
"To tell somebody that he is wrong is called criticism. To do so officially is called testing."
Sign On Testers Doors
Do not disturb. Already disturbed !!!
1. We don't make software, but we make software better.
2. Software Testing is the only place where failure is always an option.
3. We break software so you don't have to.
4. Software Testing: The Bug Stops Here
5. We don't find bugs by chance , we create them by choice
Newton’s law on Testers
Bugs can neither be created nor be removed from software by a developer. It can only be converted from one form to another. The total number of bugs in the software always remains constant
Testing Definition
"To tell somebody that he is wrong is called criticism. To do so officially is called testing."
Sign On Testers Doors
Do not disturb. Already disturbed !!!
Subscribe to:
Posts (Atom)